EPP products

HSV Polska: quality control and packaging line

Cycle time under 120 s

HSV Polska makes products from EPP and needed a line for quality control and packaging. The integrator Redhawk prepared the concept with a visualization and a simulation in Studio 3D.

The challenge

HSV Polska needed a line that combines quality control and packaging for its EPP products.

The concept

The integrator Redhawk prepared a concept with a visualization and a simulation in Studio 3D, so the line could be assessed before it was built.

The result

The line uses a Fanuc M-10iD/8L robot and has a cycle time under 120 seconds.

Read the full case study on dbr77.com

IN THE APPLICATION

How this step looks in DBR77 Marketplace

Concepts submitted to a manufacturer's challenges, filterable by status and challenge: a natural point to build the shortlist. Sample data.Concepts submitted to a manufacturer's challenges, filterable by status and challenge: a natural point to build the shortlist. Sample data.
Concepts submitted to a manufacturer's challenges, filterable by status and challenge: a natural point to build the shortlist. Sample data.
An integrator's concept in DBR77 Marketplace, with its description and the operational assumptions behind it. Sample data.An integrator's concept in DBR77 Marketplace, with its description and the operational assumptions behind it. Sample data.
An integrator's concept in DBR77 Marketplace, with its description and the operational assumptions behind it. Sample data.

The screens show the application with sample data. They are not the customer's data.

Planning a similar project?

Read how the role works in the application, or talk to the team.